+91-9640698097

training@targettechsolution.com

SAP Plant Maintenance (PM) Training

The SAP Plant Maintenance comprises of the following activities such as inspection, to measures and establish the actual condition of a technical system, preventive maintenance to measures and maintain the ideal condition of a technical system, repair to measures and restore the ideal condition of a technical system and other measures that need to be taken using the maintenance organization.

SAP PM (Plant Mantainence) is closely integrated with other modules (for example, Materials Management, Production, Sales and Distribution, Personnel Management, and Controlling) the data is always kept current and processes that are necessary for Plant Maintenance and Customer Service are automatically triggered in other areas (for example, a purchase requisition for non-stock material in the Materials Management/Purchasing area).

SAP PM Course Content.

Section I

Organization Structure in SAP Plant Maintenance

  1. Maintenance Plant
  2. Planning Plant
  3. Planner Group
  4. Maintenance Work Center
  5. Location
  6. Plant Section

Section II

Master Data

  1. Functional Location Master
  2. Equipment master
  3. Material Master
  4.  Class
  5. Characteristics
  6. Serial Number Management
  7. Measuring Points
  8. Counters
  9. Permits
  10. Measuring Documents
  11. Maintenance Bill of Material
  12. Catalogue Code Group, codes
  13. Task List
  14. Maintenance Strategy

Section III

Business Processes

  1. Corrective Maintenance
  2. Breakdown Maintenance
  3. Conditional Maintenance
  4. Preventive Maintenance
  5. Calibration Process
  6. Refurbishment Process
  7. Warranty Order Process
  8. Modification Process
  9. Overhauling Process

Section IV

  1. Reporting
  2. SAP PM Tables
  3. Work Clearance Management (Standard Model & Enhanced Model)
  4. Integration of PM with QM, PS, PP, MM, FI and CO
  5. ASAP Methodology

 

Level – II Programme: Project on Real Time Scenarios

  • Explanation on ASAP Methodology
  • Demo on Live Systems
  • SAP R/3 System Landscape Model – Transport Strategy
  • Project Implementation through SAP Solution Manager
  • End-to-End Implementation Project on real time business objects in phase sequence as shown below.
  1. Project Preparation
  2. Business Blue Print
  3. Realization
  4. Final Preparation
  5. Go-Live
  • Ellaborating the role of Consultants in different stages of project including documentation, presentations to be done by them
  • Project Environment & roles n responsibilities in other types of projects
  1. Support/ Maintenance
  2. Roll-out/ Template
  3. Upgradation
  • Overview on Interaction with clients & team in On-site/ Off-Shore Model
  • Liaison between Offshore and Onsite
  • Mock Interview by real-time faculty
  • Feedback form for each consultant on Technical & project concepts
  • 100% Job assistance

Enquiry

Name:

Enquiry For:

Email:

Phone:

Message: